---Advertisement---

India

Ganga Expressway: 594-Km Route Linking Western And Eastern Uttar Pradesh Expected To Open By…

UP CM Yogi Adityanath said, "This is one of the longest expressways in the country… The entire work of the Ganga Expressway has to be completed by November… It holds the ability to land any fighter or commercial aircraft…"

The much-awaited Ganga Expressway is likely to be completed by November this year. Uttar Pradesh Chief Minister Yogi Adityanath inspected the expressway on Sunday, April 27. The ambitious infrastructure project aims to connect the western and eastern parts of the State and stretches approximately 600 kilometers from Meerut to Prayagraj.

---Advertisement---

UP CM Yogi Adityanath said, “This is one of the longest expressways in the country… The entire work of the Ganga Expressway has to be completed by November… It holds the ability to land any fighter or commercial aircraft…”

---Advertisement---

Ganga Expressway

CM Yogi Adityanath also inspected the construction work of the Ganga Expressway in Hardoi. The Ganga Expressway with a proposed length of 594 kilometres. Ganga Expressway is the second in terms of length in the country after the longest, the Mumbai-Nagpur Expressway.

Benefits From The Project

Uttar Pradesh currently has four expressways that feature among the top 10 expressways in terms of length in India. Once the Ganga Expressway becomes operational, the state will have five of the top 10 expressways in the country. This expressway will connect the state from east to west through 518 villages in 12 districts.

---Advertisement---

After the expressway opens, the distance from Meerut to Prayagraj via Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, and Pratapgarh will be covered in just a few hours. The Ganga Expressway will start from Bijauli village on Meerut-Bulandshahr (NH 334) and end near Judapur Dadu village on (NH 19) in Prayagraj.

The expressway is being built on 7467 hectares of land at an estimated cost of Rs 36,230 crore. Big planes will be able to land, two long bridges will be built on the Ganga and Ramganga. The Ganga Expressway will initially have six lanes, with a proposal to expand it to eight lanes later. Its design allows for a speed of 120 kilometres per hour.

Nine public amenities complexes will be developed along the expressway at various locations for public convenience. Two main toll plazas (Meerut and Prayagraj) are planned, while ramp toll plazas are proposed at 15 locations. Additionally, two large bridges will be built over the Ganga River (960 meters) and the Ramganga River (720 meters). Furthermore, a 3.50-kilometre-long airstrip will be constructed near the Jalalabad tehsil in Shahjahanpur.

Also Read: Good News For Commuters! Noida Metro To Set Up Commercial Stores At THESE Stations; Check For More Inside

First published on: Apr 27, 2025 03:45 PM IST


Get Breaking News First and Latest Updates from India and around the world on News24. Follow News24 on Facebook, Twitter.

Related Story

Live News

---Advertisement---


live

Monsoon Live Updates: Heavy To Very Heavy Rainfall Expected Across India Through July 9

Jul 04, 2025
Monsoon LIVE Updates
  • 15:19 (IST) 4 Jul 2025

    According to the IMD, very heavy rainfall is likely in eastern Rajasthan on July 4.

N24 Shorts Logo

SHORTS

Image Credit - X-Platform
Sports

ENG Vs IND: Michael Vaughan Issues Challenge To Team India’s New Core

Vaughan also acknowledged Indian batter's strong performances in the ongoing Test series but also warned about the replacement with a stature of Virat Kohli.

View All Shorts

---Advertisement---

Trending

Hot Links: teen patti master downloadable content master teen patti teen patti palace teen patti royal - 3 patti