Question
Download Solution PDFIn normal circumstances, formwork of slabs may be removed (Props left under) after expiry of -
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFConcept:
As per IS 456 2000, minimum period before striking formwork for various components are as follows-
Type of Formwork | Minimum Period Before Striking Formwork |
Vertical formwork to columns, walls, beams |
16-24 h |
Soffit formwork to slabs (Props to be re-fixed immediately after removal of formwork) |
3 days |
Soffit formwork to beams (Props to be re-fixed immediately after removal of formwork) |
7 days |
Props to slabs:1) Spanning up to 4.5 m 2) Spanning over 4.5 m |
7 days 14 days |
Props to beams and arches: 1) Spanning up to 6 m 2) Spanning over 6 m |
14 days 21 days |
Last updated on Mar 26, 2025
-> UKPSC JE Notification for 2025 will be out soon!
-> The total number of vacancies along with application dates will be mentioned in the notification.
-> The exam will be conducted to recruit Junior Engineers through Uttarakhand Public Service Commission.
-> Candidates with an engineering diploma in the concerned field are eligible.
-> The selection process includes a written exam and document verification. Prepare for the exam with UKPSC JE Previous Year Papers.