Question
Download Solution PDFWhere was India’s first nuclear power plant set up?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFAbout Tarapur Atomic Power Station:
- Tarapur Atomic Power station is located in Tarapur, Maharashtra.
- It was the first commercial atomic power station of India commissioned on 28th October 1969.
- It was commissioned under 123 agreements signed between India, the United States, and International Atomic Energy Agency.
- The station is operated by the National power corporation of India.
Nuclear Power Plant | State of location | Opened in |
Kudankulam | Tamil Nadu | 1998 |
Tarapore | Maharashtra | 1969 |
Kaiga | Karnataka | 2000 |
Narora | Uttar Pradesh | 1991 |
Nuclear power plant | State | Capacity |
Tarapur Nuclear power plant | Maharashtra | 1400 MW |
Rawatbhata Nuclear power plant | Rajasthan | 1180 MW |
Kudankulam Nuclear power plant | Tamil Nadu | 2000 MW |
Kaiga Nuclear power plant | Karnataka | 880 MW |
Last updated on Jun 13, 2025
-> BPSC AE 2025 exam date has been revised. The exam will be conducted on July 17, 18 & 19 now.
-> Candidates who were facing technical issues while filling form can now fill the BPSC AE application form 2025 without any issue.
->BPSC AE age limit 2025 has been revised.
->BPSC AE application form 2025 was released on April 30. The last date to fill BPSC AE form 2025 was May 28.
->BPSC AE interview call letters released for Advt. 32/2024.
->BPSC AE notification 2025 has been released.
->A total of 1024 vacancies are announced through BPSC AE recruitment 2025
->The BPSC Exam Calendar 2025 has been released for the Assistant Engineer Recruitment.
-> The selection will be based on a written exam and evaluation of work experience.
-> Candidates with a graduation in the concerned engineering stream are eligible for this post.
-> To prepare for the exam solve BPSC AE Previous Year Papers. Also, attempt the BPSC AE Civil Mock Tests.