In a hydroelectric power plant, where is the hydro penstock typically positioned?  

This question was previously asked in
BHEL Supervisor Trainee Mechanical 21 Jan 2024 Official Paper
View all BHEL Supervisor Trainee Papers >
  1. Between the forebay and the turbine inlet  
  2. Between the dam and the spillway  
  3. Between the turbine outlet and the tailrace 
  4. Between the reservoir and the forebay  

Answer (Detailed Solution Below)

Option 1 : Between the forebay and the turbine inlet  
Free
BHEL Supervisor Trainee General Knowledge Mock Test
3.1 K Users
20 Questions 20 Marks 12 Mins

Detailed Solution

Download Solution PDF

Explanation:

Hydroelectric Power Plant

  • A hydroelectric power plant is a facility that generates electricity by harnessing the energy of flowing or falling water.
  • It typically involves the conversion of kinetic energy from water into mechanical energy using turbines, which is then converted into electrical energy through generators.
  • In a hydroelectric power plant, water is stored in a reservoir behind a dam.
  • The water is released through a controlled outlet called a penstock.
  • The kinetic energy of the flowing water drives turbines connected to generators, producing electricity.
  • The water is then discharged back into the river or a tailrace downstream of the plant.

Components:

  • Dam: Structures that store water in a reservoir, creating a height difference essential for generating energy.
  • Forebay: A basin that acts as a buffer, regulating the flow of water to the turbines.
  • Penstock: Large pipes or conduits that carry water from the reservoir or forebay to the turbines.
  • Turbines: Mechanical devices that convert the kinetic energy of water into mechanical energy.
  • Generators: Devices that convert mechanical energy from the turbines into electrical energy.
  • Spillway: A structure used to provide controlled release of water from the dam to prevent overflow.
  • Tailrace: A channel that carries water away from the turbines and back into the river.

F5 Engineering Mrunal 17.02.2023 D2

Latest BHEL Supervisor Trainee Updates

Last updated on Jul 9, 2025

->  BHEL Supervisor Trainee Result 2025 has been announced. Candidates can check their result at official website.

-> BHEL answer key 2025 for Supervisor Trainee has been released.

-> The BHEL Supervisor Trainee Admit Card 2025 has been uploaded. The Exam will be conducted on 11th, 12th and 13th April 2025.

-> BHEL Supervisor Trainee 2025 Notification has been released.

-> The Bharat Heavy Electrical Limited (BHEL) has announced 250 vacancies for the Supervisor Trainee post. 

-> The applications can be submitted online from 1st to 28th February 2025.

-> The BHEL has also released the BHEL ST Exam Pattern

-> The selection for the BHEL Supervisor Trainee post will be based on an online examination and document verification.

Get Free Access Now
Hot Links: teen patti game online teen patti real cash 2024 all teen patti teen patti king